Installation Procedure
- Add oil to the new receiver-dryer. Use the exact amount of oil that you drained from the receiver-dryer.
- Install new O-rings in the seal area recess of the new receiver-dryer.
- Install the receiver-dryer into the clamp position.
- Install the connector block retaining bolt to the receiver-dryer.
Tighten: Tighten the receiver-dryer bolt to 14 N.m (10 lb ft).
- Install and tighten the band clamp bolt.
- Connect the negative battery cable.
- Evacuate and recharge the A/C system. Refer to Refrigerant Recovery and Recharging .
IMPORTANT:
Do not uncap the new unit until just prior to installation.
NOTE:
Refer to Fastener Notice
.