Installation Procedure
- Install the air temperature actuator.
- Install the retaining screws and tighten.
- Install the actuating rod.
- Connect the electrical connector.
- Install the instrument panel assembly. Refer to Instrument Panel Assembly Replacement
- Connect the negative battery cable.