Intermediate Shaft and Dash Seal Removal and Installation: Installation
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2008 Suzuki Reno, 2008 Suzuki Forenza, 2007 Suzuki Reno, 2007 Suzuki Forenza, and 2006 Suzuki Reno. However, it is still accessible from the selected car via links, so may be relevant.
- Install the intermediate shaft into the vehicle.
- Install the dash seal retaining ring with the nuts.
Tighten:
Tighten the dash seal retaining ring nuts to 7 N.m (62 lb-in).
- Attach the upper universal joint of the intermediate shaft onto the steering column.
- Install the pinch bolt into the upper universal joint on the intermediate shaft and tighten the bolt.
Tighten:
Tighten the upper intermediate shaft pinch bolt to 22 N.m (16 lb-ft).
- Attach the lower universal joint of the intermediate shaft onto the steering gear stub shaft.
- Install the bolt into the lower universal joint on the intermediate shaft and tighten the bolt.
Tighten:
Tighten the lower intermediate shaft pinch bolt to 25 N.m (18 lb-ft).