Time required
WARNING: This page is about a different car, the 2006 Suzuki Reno and 2006 Suzuki Forenza. However, it is still accessible from the selected car via links, so may be relevant.
Time Length and Frequency:
19 test failures within a 40 test samples.
Failure Time:
Continuous monitoring every 125 ms.