LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2007 >> Aerio L4-2.3L >> Repair and Diagnosis >> Transmission and Drivetrain >> Automatic Transmission/Transaxle >> Service and Repair >> Overhaul (Internal Components) >> Planetary Gear Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Planetary Gear Inspection

Planetary Gear Inspection
Reference: Planetary Gear Disassembly and Reassembly

Rear Planetary Ring Gear Assembly
Visually check the following parts for scratches or discoloration.
^ Inner surface of planetary ring gear.

Planetary Front Gear
Measure inside diameter of planetary front gear (1) bushing, using special tools. If inside diameter exceeds limit, replace planetary front gear.

Planetary front gear bushing inside diameter limit 30.13 mm (1.186 inch)

Special Tool
(A): 09900-20607
(B): 09900-22403

NOTE: Perform measurement at several points.





Planetary Sun Gear
Measure inside diameter of planetary sun gear (1) bushing, using special tools. If inside diameter exceeds limit, replace planetary sun gear.

Planetary sun gear bushing inside diameter limit 21.58 mm (0.849 inch)

Special Tool
(A): 09900-20607
(B): 09900-22403

NOTE: Perform measurement at several points.