Throttle Body Removal and Installation: Installation
WARNING: This page is about a different car, the 2006 Suzuki XL-7. However, it is still accessible from the selected car via links, so may be relevant.
Reference: THROTTLE BODY CLEANING
- Clean mating surfaces and install new throttle body gasket (2) to intake collector (1).
- Install throttle body to intake collector and tighten bolts and nuts.
- Connect PCV hose to throttle body.
- Install throttle body and intake collector to intake manifold with new intake collector gaskets.
- Install EGR pipe with new gaskets.
- Connect breather hose, EVAP canister purge valve hose and PCV valve hose.
- Connect connectors of EVAP canister purge valve and EGR valve.
Fix wire harness with clamps.
- Install clamp bracket to intake collector.
- Connect ground wire connector.
- Connect connectors of TP sensor and IAC valve.
- Install surge tank pipe and intake control valve to intake manifold with new gaskets and intake air pipe to throttle body. Install surge tank cover.
- Connect water hoses to throttle body.
- Connect accelerator cable.
- Install strut tower bar (1) and tighten strut tower bar mounting bolts (2) to specification.
Tightening torque
Strut tower bar mounting bolts a: 50 N.m (5.0 kg-m, 36.5 lb-ft)
- Install fuse/relay box.
- Refill cooling system referring to COOLING SYSTEM FLUSH AND REFILL .
- Connect negative (-) cable at battery.
- Adjust accelerator cable referring to ACCELERATOR CABLE ADJUSTMENT .