Input Shaft Disassembly and Assembly: Assembly
WARNING: This page is about a different car, the 2006 Suzuki XL-7. However, it is still accessible from the selected car via links, so may be relevant.
Reference: INPUT SHAFT INSPECTION
- Bring bearing (1) so that its groove for C-ring is in the front of input shaft (2) and press-fit with special tools and hydraulic press.
Special Tool
(A): 09940-51710
(B): 09924-07720
(C): 09924-07710
- Select circlip (1) that will make thrust clearance of bearing 0.1 mm (0.0039 in) or less and install it.CIRCLIP THICKNESS SPECIFICATIONS
ID mark Circlip thickness ID mark Circlip thickness A 2.10 - 2.15 mm (0.0826 - 0.0846 in.) E 2.30 - 2.35 mm (0.0906 - 0.0925 in.) B 2.15 - 2.20 mm (0.0846 - 0.0866 in.) F 2.35 - 2.40 mm (0.0925 - 0.0945 in.) C 2.20 - 2.25 mm (0.0866 - 0.0886 in.) G 2.40 - 2.45 mm (0.0945 - 0.0965 in.) D 2.25 - 2.30 mm (0.0886 - 0.0906 in.) - Install roller bearing (1) to input shaft (2).