Installation Notice
Tighten:
- Tighten the torque brake pipe fitting nuts to 16 N.m (12 lb-ft)
- Tighten the EBCM mounting bracket Bolts to 22 N.m (16 lb-ft)
- Add new brake fluid.
- After the installation, bleed the brake system. Refer to MANUAL BLEEDING THE BRAKES .
- Check the brake system for leaks.
- Care must be taken to prevent the brake fluid from contacting any painted surface to prevent damage to the paint finish.