LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2006 >> Verona Base >> Repair and Diagnosis (Single Page) >> Body & Frame >> Exterior Body Panels >> Body Frame >> Repair Instructions >> Center Member Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Center Member Installation

  1. Install the center member with the bolts (center member-to-radiator bolt shown).

    Tighten: 

    • Tighten the center member-to-crossmember bolt to 90 N.m (66 lb-ft).
    • Tighten the center member-to-radiator bolt to 90 N.m (66 lb-ft).
      Fig 1: Identifying Center Member With Bolts
      G04720285Courtesy of SUZUKI OF AMERICA CORP.
  2. Install the rear engine mount through-bolt.

    Tighten: 

    Tighten the rear engine mount through-bolt to 80 N.m (59 lb-ft).

  3. Install the forward engine mount through-bolt.

    Tighten: 

    Tighten the forward engine mount through-bolt to 80 N.m (59 lb-ft).

  4. Install the power steering return line to its original position and install the bolts.
  5. Install the engine under covers. Refer to Engine Under Covers Installation .

    Tighten: 

    Tighten the power steering return pipe fixing bolts to 7 N.m (62 lb-in.).

    Fig 2: Identifying Forward Engine Mount Through-Bolt
    G04720284Courtesy of SUZUKI OF AMERICA CORP.