w/o Service Bay Test
- Disconnect the EVAP vent line from the vent solenoid, and seal it, using the correct plug from the J 41413-300.
- Use the remote switch to activate the J 41413-200.
- Use the remote switch to introduce nitrogen and fill the EVAP system until the floating indicator stabilizes.
- Verify the flow meter stable floating indicator position is at or below the red flag.
- Clear the DTCs with a scan tool.