LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2006 >> Swift + >> Repair and Diagnosis (Single Page) >> Engine Performance >> Testing & Diagnosis >> Engine Controls - 1.6L (L91) - Introduction (2 Of 2) >> Repair Instructions >> Intake Manifold Tuning (IMT) Valve Actuator Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

    Fig 1: View Of Fuel Rail
    GM1371864Courtesy of GENERAL MOTORS CORP.
  1. Install the IMT valve actuator valve to the IMT valve.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the IMT valve actuator valve bolts.

    Tighten:  Tighten the IMT valve actuator valve retaining bolts to 12 N.m (106 lb ft).

  4. Connect the vacuum hose to the IMT valve actuator valve.