Installation Procedure
WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
- Position the trailing arm bracket to the trailing arm.
- Loosely install the trailing arm bushing to bracket nut and bolt.
- Push upward on the trailing arm bracket and loosely install the front bolt.CAUTION: Refer to FASTENER NOTICE .
- Use a drift to align the remaining trailing arm bracket bolts.
Tightening torque
Tighten the trailing arm bracket to body bolts to 110 N.m (81 lb ft).
- Tighten the trailing arm bushing to bracket nut and bolt.
Tightening torque
Tighten the bolt to 160 N.m (118 lb ft).
- Install the park brake cable on the trailing arm and on the frame. Refer to INSTALLATION PROCEDURE .
- Remove the support and lower the vehicle.