LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2006 >> Aerio L4-2.3L >> Repair and Diagnosis >> Transmission and Drivetrain >> Automatic Transmission/Transaxle >> Service and Repair >> Overhaul (Transaxle) >> 4. Forward Clutch Preliminary Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

4. Forward Clutch Preliminary Check

Part 1 Of 2:




Part 2 Of 2:






Forward Clutch Preliminary Check





1. Measure piston stroke before disassembly.
a. Install forward clutch assembly (2) to transaxle rear cover (1).
b. Measure piston stroke while applying and releasing compressed air (400 - 800 kPa, 4 - 8 kgf/cm2, 57 - 113 psi) through oil hole (3) using special tools.
Special Tool
(A): 09900-20606
(B): 09900-20701
Forward clutch piston stroke
Standard: 0.84 - 1.06 mm (0.033 - 0.042 inch)
If measured piston stroke exceeds specified value, disassemble and inspect inner parts.