Mainshaft Disassembly and Assembly: Disassembly
WARNING: This page is about a different variant/trim than selected.
- Remove the mainshaft bearing using the universal bearing puller J-22912-01.
- Remove the snap ring.
- Remove the first gear, the flat-type first-gear needle bearing, and the mainshaft wear plate.
- Remove the synchronizer hub sleeve that contains the synchronizer spring.
- Remove the outer blocking ring.
- Remove the keys from the first-second synchronizer gear.
- Remove the barrel-type first-gear needle bearing.
- Remove the snap ring and the washer.
- Remove the first-second synchronizer gear from the mainshaft.
- Remove the first-second gear blocking ring.
- Remove the second gear using the universal bearing puller J-22912-01.
- Remove the second-gear needle bearing.
- Remove the ring and the thrust washer.
- Remove the third gear and the synchronizer blocking ring.
- Separate the synchronizer blocking ring from the third gear.
- Remove the third-gear needle bearing from the mainshaft.
- Remove the synchronizer sleeve containing the keys and the spring.
- Remove the snap ring and the washer from the mainshaft.
- Remove the third-fourth synchronizer gear containing the synchronizer spring.
- Remove the fourth-gear assembly.
- Separate the synchronizer blocking ring from the fourth gear.
- Remove the fourth-gear needle bearing, the ring, and the thrust washer.
- Remove the mainshaft bearing.