Exhaust Gas Recirculation (EGR) Valve Installation
- Installation should follow the removal procedure in the reverse order.
- Install the EGR valve.
Tighten
- Tighten the EGR valve retaining bolts to 20-30 N.m (15-22 lb-ft).
Courtesy of SUZUKI OF AMERICA CORP.