Installation Procedure
- Install the temperature gage to the cluster assembly with the screws.
- Install the instrument cluster lens and the face plate.
- Install the instrument cluster. Refer to Instrument Panel Cluster (IPC) Replacement .
- Connect the negative battery cable.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.