Bed Plate Installation
WARNING: This page is about a different car, the 2004 Suzuki Verona. However, it is still accessible from the selected car via links, so may be relevant.
- Installation should follow the removal procedure in the reverse order.
- Clean the contact surfaces between the bed plate and the cylinder block.
- Apply the liquid gasket (Loctite® 5900-M8585) on the bed plate.
- Install the bed plate.
- Tighten
Tighten the bed plate inner bolts to 33 N.m (24 lb-ft). After tightening all the inner bolts, turn the bolts by 135° each.
- Tighten the bed plate outer bolts.
Tighten
Tighten the bed plate outer bolts to 20-26 N.m (15-19 lb-ft).
- Install the oil pump. Refer to Oil Pan / Oil Pump Removal .
- Install the oil pump chain lever.
- Tighten
Tighten the oil pump chain lever bolt to 6-10 N.m (53-89 lb-in).
- Install the bed plate baffle.
- Tighten
Tighten the bed plate baffle bolts to 7-9 N.m (62-80 lb-in).
- Install the oil pan. Refer to Oil Pan / Oil Pump Installation .
- Install the engine oil dipstick tube.
- Tighten
Tighten the engine oil dipstick tube bracket bolt to 18-22 N.m (13-16 lb-ft).
Tighten the engine oil dipstick tube bolt to 8-10 N.m (71-89 lb-in).
- Install the CKP (Crankshaft Position) sensor. Refer to CRANKSHAFT POSITION (CKP) SENSOR INSTALLATION .
- Install the lower pad bracket.
- Tighten
Tighten the lower pad bracket bolts to 35-55 N.m (26-33 lb-ft).
- Install the idler.
- Tighten
Tighten the idler retaining bolt to 35-55 N.m (26-33 lb-ft).
Tighten the upper pad-to-lower pad bracket bolt to 30-40 N.m (22-30 lb-ft).
- Install the compressor.
- Tighten
Tighten the compressor retaining bolts and nuts to 20-30 N.m (15-22 lb-ft).
- Install the timing chain and timing chain cover. Refer to Timing Chain Installation .
- Install the cylinder head cover. Refer to Cylinder Head Cover Installation .
- Install the engine assembly. Refer to Engine Assembly Installation .