LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2004 >> Forenza LX, Standard >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Air Conditioning System >> Repair Instructions >> Control Valve Assembly Removal and Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Valve Assembly Removal and Installation: Installation

  1. Coat all the O-rings with clean polyalkaline glycol (PAG) oil.
  2. Push the control valve in place using thumb pressure.
    Fig 1: Installing The Control Valve
    G00786213Courtesy of SUZUKI OF AMERICA CORP.
  3. Use the snap ring pliers J-5403 to install the valve retaining ring. The high point of the curved sides must be against the valve housing. Be sure the retaining ring is properly seated in the ring groove.
    Fig 2: Installing The Control Valve Retaining Ring
    G00786214Courtesy of SUZUKI OF AMERICA CORP.
  4. Evacuate and recharge the A/C system. Refer to Discharging, Adding Oil, Evacuating, and Charging Procedures for A/C System .