LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2003 >> XL-7 Base, RWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Servicing - A/T) >> Removal & Installation >> Oil Cooler Hoses >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Oil Cooler Hoses: Installation

WARNING: This page is about a different variant/trim than selected.

When replacing components, be sure to note the following: See Figure

  1. Use new union gasket "2" and connect oil cooler pipes "1" to oil outlet unions.
  2. Connect hoses to pipes and clamp them securely.
  3. Tighten union bolts to specified torque with oil outlet union locked. See TORQUE SPECIFICATIONS  .
  4. Tighten pipe bolt "3" securely.
  5. Check A/T fluid level. See CHECKING FLUID LEVEL  .
  6. Check for fluid leakage after warming up A/T.