LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2003 >> XL-7 Base, 4WD >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Air Conditioning Systems >> Repair Instructions >> A/C Refrigerant (Dual) Pressure Switch Inspection for H25 Engine Model
April 5, 2026: LEMON Manuals is launched! Read the announcement.

A/C Refrigerant (Dual) Pressure Switch Inspection for H25 Engine Model

  1. Check dual pressure switch (1) on liquid pipe for continuity at normal temperature (approx. 25 °C, 77 °F) when A/C system has a proper charge of refrigerant and when A/C system (compressor) is under operation. In each of these cases, switches should show proper continuity.
    Fig 1: Checking Dual Pressure Switch
    G01326957Courtesy of SUZUKI OF AMERICA CORP.
  2. Using a manifold gauge set, check switch for operation specified pressure as shown, refer to PERFORMANCE DIAGNOSIS OF A/C SYSTEM  .

Dual pressure switch specifications 

Switch ON:  Above "C" and below "D"

Switch OFF:  Below "A" or above "B"

"A":  Approx. 200 kPa (2.0 kg/cm2 )

"B":  Approx. 3200 kPa (32 kg/cm2 )

"C":  Approx. 23 kPa (2.3 kg/cm2 )

"D":  Approx. 2800 kPa (28 kg/cm2 )

Tightening torque 

Dual pressure switch:  10 N.m (1.0 kg-m, 7.5 lb-ft)

Fig 2: Checking Switch For Operation
G01326958Courtesy of SUZUKI OF AMERICA CORP.