LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Suzuki
>>
2002
>>
XL-7 Plus 4WD V6-2.7L
>>
Repair and Diagnosis
>>
Heating and Air Conditioning
>>
Air Conditioning Switch
>>
Testing and Inspection
>>
A/C Switch
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
A/C Switch
-
Press A/C button (2) and check if there is continuity between terminals "D" and "G".
-
With battery voltage (+) connected to terminal "K" and (-) to terminal "D", press A/C button (2) and check if indicator lamp (3) lights.