LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2001 >> XL-7 Plus 2WD V6-2.7L >> Repair and Diagnosis >> Heating and Air Conditioning >> Heater Control Valve >> Heater Control Valve Cable >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Heater Control Valve Cable: Testing and Inspection

Heater Control Cables:






REMOVAL




1. Remove heater control lever assembly. Refer to "CONTROL ASSEMBLY/ HEATER CONTROL LEVER ASSEMBLY".
2. Disconnect control cables (2) from control lever assembly (1).

INSTALLATION
Install control cables by reversing removal procedure, noting the following point.
- After installing control cables, be sure that control levers move smoothly and stop at proper position.




- Move control lever (1) to FRESH position (2), then push lever fully in arrow direction (4) and fix cable (3) with clamp in position as shown in the figure.