LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1998 >> Sidekick Sport 2D JS 2WD L4-1.8L >> Repair and Diagnosis >> Powertrain Management >> Ignition System >> Ignition Timing >> Ignition Timing Connector >> Description and Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Timing Connector: Description and Operation

The Test switch terminal is included in the Diagnosis (Monitor) connector. When this terminal is grounded, ECM fix the ignition timing to initial one.