LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1998 >> Sidekick JS, 2D Utility, Automatic >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - System/Component Tests >> Relays & Solenoids >> Relays >> Main Relay (Sidekick & X-90)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Main Relay (Sidekick & X-90)

  1. Disconnect negative battery cable. Remove main relay. Main relay is located under instrument panel, attached to side of heater case. Using an ohmmeter, measure resistance between terminals No. 2 and 4. See Figure -13.
  2. Continuity should not be present. If continuity is present, replace relay. Measure resistance between terminals No. 1 and 3. On models produced in Japan, resistance should be 61-75 ohms. On models produced in Canada, resistance should be 79-95 ohms. If resistance is not as specified, replace relay. Apply battery voltage and ground to terminals No. 2 and 4. Continuity should now be present between terminals No. 1 and 3. If continuity is not present, replace relay.