LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1998 >> Sidekick JS 2D 2WD L4-1.6L >> Repair and Diagnosis >> Powertrain Management >> Ignition System >> Ignition Timing Connector >> Description and Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Timing Connector: Description and Operation





The test switch terminal is included in the engine-room monitor coupler. When this terminal is grounded, ECM sets the ignition timing to the initial ignition timing.
When both test switch terminal and diagnosis switch terminal are grounded, ECM outputs A/F duty through the duty output terminal.