LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1998 >> Sidekick JS 2D 2WD L4-1.6L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Transmission Position Sensor/Switch >> Testing and Inspection >> Park/Neutral Change Switch Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Park/Neutral Change Switch Inspection

P/N CHANGE SWITCH

INSPECTION







Check continuity between terminal (3) and terminal (4) as shown above.
1) When this switch is in "N" position, there should be no continuity.
2) When this switch is in "P" position, there should be continuity.