LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1998 >> Esteem GL, 4D Sedan, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 2 (A/C-Heater System) >> Testing >> A/C Switch
April 5, 2026: LEMON Manuals is launched! Read the announcement.

A/C Switch

WARNING: This page is about a different car, the 1997 Suzuki Esteem. However, it is still accessible from the selected car via links, so may be relevant.

Disconnect negative battery cable. Remove A/C-heater control knob and panel to access A/C switch. Disconnect A/C switch electrical connector. Using an ohmmeter, test continuity between indicated switch terminals. See A/C SWITCH CONTINUITY TEST  table. If continuity is not as specified, replace A/C switch.

A/C SWITCH CONTINUITY TEST

Switch Position Continuity Between Wires
Off Red/Yellow & Black
Off Green/Red, Green/White & Green/Blue
On Red/Yellow & Black
On Green/Red, Green/White,
On Green/Blue & Green/Black