LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1997 >> Swift L4-1298cc 1.3L SOHC MFI >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Throttle Full Close Switch >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Throttle Full Close Switch: Testing and Inspection

- Disconnect connector from ISC actuator.





- Arrange 3 new 1.5V batteries in series (4.5V in total) and connect these batteries to CTP switch terminals "A" and "B".
Check voltage between terminals "B" and "C" under following each condition.

Throttle lever is in contact with ISC actuator plunger : 0 - 1V
Throttle lever is apart from plunger : 3.5 - 5.5V

If check result is not satisfactory, replace throttle lower body.