LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1997 >> Sidekick JS, 2D Utility, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 24 (Engine Controls - System/Component Tests) >> Relays & Solenoids >> Relays >> Main Relay
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Main Relay

WARNING: This page is about a different car, the 1997 Suzuki X-90. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect negative battery cable. Remove main relay. Main relay is located under instrument panel, attached to side of heater case. Using an ohmmeter, measure resistance between terminals No. 2 and 4. See Figure or Figure .
  2. Continuity should not be present. If continuity is present, replace relay. Measure resistance between terminals No. 1 and 3. On models produced in Japan, resistance should be 61-75 ohms. On models produced in Canada, resistance should be 79-95 ohms. If resistance is not as specified, replace relay. Apply battery voltage and ground to terminals No. 2 and 4. Continuity should now be present between terminals No. 1 and 3. If continuity is not present, replace relay.