LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1997 >> Esteem GL L4-1.6L >> Repair and Diagnosis >> Powertrain Management >> Ignition System >> Ignition Timing >> Ignition Timing Connector >> Description and Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Timing Connector: Description and Operation





The test switch terminal is included in the diagnosis connector 1 in relay box. When this terminal is grounded, ECM fix the ignition timing to initial one. When both test switch terminal and diagnosis switch terminal are grounded, ECM Output A/F duty through the duty output terminal.