LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1996 >> Sidekick JS, 2D Utility, Automatic >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - Tests W/Codes - 1.8L >> Circuit Tests >> DTC P1530 - Ignition Timing Adjustment Switch CKT Malfunction
April 5, 2026: LEMON Manuals is launched! Read the announcement.

DTC P1530 - Ignition Timing Adjustment Switch CKT Malfunction

  1. Locate test connector next to coolant recovery bottle. Ensure test connector terminals are not grounded or jumpered. Repair as necessary. If test connector is okay, go to next step.
  2. Turn ignition on. Using a voltmeter, measure voltage (backprobe) between ground and PCM harness connector "A", terminal No. 5 (Blue/Red wire). If reading is 10-14 volts, replace PCM. If reading is not as specified, repair Blue/Red wire for short to ground. Retest system.