LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1995 >> Esteem L4-1590cc 1.6L SOHC 0 MFI 16V >> Repair and Diagnosis >> Maintenance >> Tune-up and Engine Performance Checks >> Ignition Timing >> Specifications
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Timing: Specifications

Ignition timing at idle (A/T in P or N, M/T in N)
with terminals D and E of DLC 1
connected 5° ± 1° BTDC
disconnected approximately 12° BTDC

NOTE: Constant variation within a few degrees from 12° indicates no abnormality, but proves operation of electronic timing control system.