LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1994 >> Sidekick JS, 2D Utility, Standard >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Overhaul - 4-Speed >> On-Vehicle Service >> Valve Body Assembly >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Valve Body Assembly: Installation

  1. To install, reverse removal procedure. Ensure manual shift lever in transmission case aligns with manual valve of valve assembly. Connect throttle cable to cam.
  2. Loosely install appropriate bolts in correct positions. See Fig 1. Install valve assembly and tighten bolts to 84 INCH lbs. (10 N.m). Install oil tubes in proper order. See Figure. Install oil strainer and tighten bolts to 48 INCH lbs. (5.4 N.m). Ensure magnets are installed in oil pan. Install oil pan and tighten bolts to 48 INCH lbs. (5.4 N.m). Fill transmission with ATF to proper fluid level.
Fig 1: Identifying Valve Body Bolt Length & Locations
G95J21237Courtesy of SUZUKI OF AMERICA CORP.