LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1994 >> Sidekick JS, 2D Utility, Standard >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Overhaul - 4-Speed >> Component Disassembly & Reassembly >> Overdrive Brake >> Disassembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Overdrive Brake: Disassembly

  1. Prior to disassembly, check OD brake clutch pack clearance. Using a feeler gauge, measure clearance between snap ring and flange. See Fig 1. Clearance should be .014-.075" (.35-1.91 mm). If clearance is not as specified, inspect discs. Remove snap ring from OD case. Remove flange, discs, plates and cushion plate. Note location and number of components. See Fig 2.
  2. Remove OD planetary ring gear, thrust bearing and races from OD case. Remove snap ring, spring seat and piston return spring. See Fig 2. Remove brake piston by applying air pressure to OD case. Remove oil seal rings from case and "O" rings from piston.
Fig 1: Measuring OD Brake Clutch Pack Clearance
G95C21255Courtesy of SUZUKI OF AMERICA CORP.
Fig 2: Exploded View Of OD Brake Components
G93C23830Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.