LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1993 >> Sidekick JS, 2D Utility, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 68 (Body Structure) >> Repair Instructions >> Front Wheelhouse Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Identifying Plug Weld Holes
G04843089Courtesy of SUZUKI OF AMERICA CORP.
NOTE: If the location of the original plug weld holes can not be determined, space the plug weld holes every 40 mm (1 1/2 in) apart.
Some panels may have structural weld-thru adhesive. It is necessary to replace the weld-thru adhesive with an additional spot weld between each factory spot weld.
  1. Drill 8-mm (5/16-in) plug weld holes in the service part as necessary in the locations noted from the original panel.
  2. Prepare all mating surfaces as necessary.
  3. Apply GM-approved Weld-Thru Coating or equivalent to all mating surfaces. Refer to ANTI-CORROSION TREATMENT AND REPAIR .
    Fig 2: Positioning Front Wheelhouse To Vehicle
    G04843090Courtesy of SUZUKI OF AMERICA CORP.
  4. Position the front wheelhouse to the vehicle using 3-dimensional measuring equipment. Clamp the front wheelhouse into place.
    Fig 3: Applying Sealers & Anti-Corrosion Materials To Repair Area
    G04843091Courtesy of SUZUKI OF AMERICA CORP.
  5. Plug weld accordingly.
    Fig 4: Identifying Tie Bar
    G04843092Courtesy of SUZUKI OF AMERICA CORP.
  6. Replace the tie bar. Refer to TIE BAR REPLACEMENT .
  7. Clean and prepare all welded surfaces.
  8. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to ANTI-CORROSION TREATMENT AND REPAIR .
  9. Paint the repair area. Refer to BASECOAT/CLEARCOAT PAINT SYSTEMS .
  10. Install all related panels and components.
  11. Connect the negative battery cable. Refer to INSTALLATION PROCEDURE .
  12. Enable the SIR system. Refer to SIR DISABLING AND ENABLING .