LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1991 >> Sidekick JS >> Repair and Diagnosis >> Transmission >> Manual Trans >> Overhaul - 5 Speed >> Component Disassembly & Reassembly >> Upper Case & Shifter Assembly >> Reassembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Upper Case & Shifter Assembly: Reassembly

  1. Install reverse gear shift fork to reverse gear shift shaft and drive in spring pin. Install reverse gear shift shaft and interlock ball to upper case. Place shaft in Neutral position.
  2. Install interlock pin to high speed shift shaft. Install shaft and high speed shift fork. Drive in spring pin and install interlock ball. Place shaft in Neutral position.
  3. Install low speed gear shift shaft and low speed gear shift fork. Drive in spring pin. Install locating balls, springs and spring bolts. Torque bolts to 21 ft. lbs. (28 N.m).
  4. Install rubber plugs and back-up light switch. Torque both switches to 15 ft. lbs. (20 N.m). Inspect interlock system for proper operation.
Fig 1: Identifying Interlock System Components
G93J24280Courtesy of GENERAL MOTORS CORP.
Fig 2: Removing & Installing Gear Shift Shaft & Fork
G93A24281Courtesy of GENERAL MOTORS CORP.
Fig 3: Installing Longer Reverse Gear Shift Fork Pin
G93B24282Courtesy of GENERAL MOTORS CORP.