LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1991 >> Samurai JS >> Repair and Diagnosis >> External Pages >> Different car >> Section 39 (Engine Exhaust System) >> Repair Instructions >> Exhaust Manifold Installation - Right Side
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Exhaust Manifold Installation - Right Side

WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.

Reference: EXHAUST MANIFOLD CLEANING AND INSPECTION - RIGHT SIDE 

Fig 1: Identifying Engine Block Heater
G04843620Courtesy of SUZUKI OF AMERICA CORP.
  1. Install the engine block heater, if equipped.
    Fig 2: Identifying NEW Crankshaft Position (CKP) Sensor O-Ring
    G04843621Courtesy of SUZUKI OF AMERICA CORP.
  2. Install a NEW crankshaft position (CKP) sensor O-ring.
    Fig 3: Identifying CKP Sensor
    G04843622Courtesy of SUZUKI OF AMERICA CORP.
  3. Install the CKP sensor.
    Fig 4: Identifying CKP Sensor Bolt
    G04843623Courtesy of SUZUKI OF AMERICA CORP.
    CAUTION: Refer to FASTENER NOTICE .
  4. Install the CKP sensor bolt.

    Tightening torque 

    Tighten the CKP sensor bolt to 10 N.m (89 lb in). 

    Fig 5: Identifying Right Knock Sensor
    G04843624Courtesy of SUZUKI OF AMERICA CORP.
  5. Install the right knock sensor.
    Fig 6: Identifying Right Knock Sensor Bolt
    G04843625Courtesy of SUZUKI OF AMERICA CORP.
  6. Install the right knock sensor bolt. Ensure the knock sensor is oriented with the harness connector positioned to the front on the right side (1).

    Tightening torque 

    Tighten the right knock sensor bolt to 23 N.m (17 lb ft). 

    Fig 7: Identifying Right Knock Sensor Heat Shield
    G04843626Courtesy of SUZUKI OF AMERICA CORP.
  7. Install the right knock sensor heat shield.
    Fig 8: Identifying Right Knock Sensor Heat Shield Bolts
    G04843627Courtesy of SUZUKI OF AMERICA CORP.
  8. Install the right knock sensor heat shield bolts.

    Tightening torque 

    Tighten the right knock sensor heat shield bolts to 50 N.m (37 lb ft). 

    Fig 9: Identifying Right Cylinder Head Studs
    G04843628Courtesy of SUZUKI OF AMERICA CORP.
  9. Install the studs into the right cylinder head.

    Tightening torque 

    Tighten the studs to 10 N.m (89 lb in). 

    Fig 10: Identifying New Right Exhaust Manifold Gasket
    G04843629Courtesy of SUZUKI OF AMERICA CORP.
  10. Install a NEW right exhaust manifold gasket.
    Fig 11: Identifying Right Exhaust Manifold
    G04843630Courtesy of SUZUKI OF AMERICA CORP.
  11. Install the right exhaust manifold.
    Fig 12: Identifying Right Exhaust Manifold Nuts
    G04843631Courtesy of SUZUKI OF AMERICA CORP.
  12. Loosely install the right exhaust manifold nuts onto the studs in the right cylinder head.
    Fig 13: Identifying Right Exhaust Manifold Bolts
    G04843632Courtesy of SUZUKI OF AMERICA CORP.
  13. Loosely install the right exhaust manifold bolts into the right cylinder head.
  14. Tighten the right exhaust manifold nuts and bolts.

    Tightening torque 

    Tighten the right exhaust manifold nuts and bolts to 25 N.m (18 lb ft). 

    Fig 14: Identifying Right Exhaust Manifold Heat Shield
    G04843633Courtesy of SUZUKI OF AMERICA CORP.
  15. Place the right exhaust manifold heat shield in position.
    Fig 15: Identifying Right Exhaust Manifold Heat Shield Bolts
    G04843634Courtesy of SUZUKI OF AMERICA CORP.
  16. Install the exhaust manifold heat shield bolts.

    Tightening torque 

    Tighten the exhaust manifold heat shield bolts to 10 N.m (89 lb in). 

Reference: ENGINE COOLANT THERMOSTAT HOUSING INSTALLATION