Oil Pressure Control Cable: Installation
- To install, reverse removal procedure. After connecting oil pressure control cable to accelerator cable, check and adjust oil pressure control cable play. See Fig 1 .
- With cable cover removed, adjust clearance "A" to specification by turning adjusting nuts "B". Adjusting nuts "C" can be used for adjustment (if necessary). Tighten adjusting nuts and install cable cover.