Oil Pan: Installation
- To install, reverse removal procedure. Clean inside of oil pan before installation. Clean oil cleaner magnet and install in oil pan below oil strainer. Install new gasket.
- Install 15 oil pan bolts. Apply Suzuki Bond Sealant (1215) to 2 cross slotted bolts. See Fig 1 . DO NOT use sealant on gasket surface. Tighten oil pan bolts diagonally to 35-53 INCH lbs. (4-6 N.m). Warm up transmission. Check for fluid level and leakage.