LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1990 >> Sidekick JS >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Heater System >> Removal & Installation >> Heater Assembly >> Removal (Samurai)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Removal (Samurai)

  1. Disconnect battery negative terminal. Drain cooling system. Disconnect heater inlet and outlet hoses at heater pipes. Remove instrument panel and speedometer assembly. See INSTRUMENT  PANEL.
  2. Loosen front door stopper screws. Remove steering column holder. Disconnect heater blower motor and resistor connectors. Loosen heater case securing nut on engine side. Remove heater assembly. Remove heater blower motor. See Fig 1 .
Fig 1: Identifying Heater & Blower Motor Assemblies (Samurai)
G66168Courtesy of SUZUKI OF AMERICA CORP.