LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 1987 >> Samurai Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 32 (Engine General Information And Diagnosis) >> Diagnostic Information and Procedures >> DTC P0135, P0141, P0155, or P0161 >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, disconnect the harness connector of the appropriate HO2S.
  2. Ignition ON, test for B+ on the HO2S ignition voltage circuit terminal C of the HO2S harness connector.
    • If less than the specified value, repair the ignition voltage circuit of the HO2S heater for a short to ground or an open/high resistance.
  3. Ignition OFF, connect a test lamp between the heater control circuit terminal D and B+.
    • If test lamp illuminates, test the heater control circuit for a short to ground. If the circuit/connections test normal, replace the ECM.
  4. Idle the engine, and verify the test lamp illuminates or flashes with bright intensity.
    • If the test lamp is always OFF, test the control circuit for an open/high resistance. If the circuit/connections test normal, replace the ECM.
      NOTE: The control circuit for the HO2S heater is pulled-up to voltage within the ECM, 2.0-3.0 volts on the control circuit is normal.
  5. Ignition ON, test for 2.0-3.0 volts between the control circuit terminal D and ground.
    • If not within the specified range, test the control circuit for a short to voltage. If the circuit/connections test normal, replace the ECM.
  6. If all circuits/connections test normal, test or replace the HO2S.