LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2023 >> Crosstrek Base, Automatic CVT Trans >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Transmission Control System >> AT Shift Lock Control System >> Inspection >> Check Body Integrated Unit Power Supply And Ground Circuit
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Check Body Integrated Unit Power Supply And Ground Circuit

NOTE: For the DC power supply circuit, refer to "WIRING DIAGRAMS".
  1. CHECK DTC  .
    1. Turn the ignition switch to ON.
    2. Read the DTC of [Body Control] using the Subaru Select Monitor. Ref. to COMMON (DIAGNOSTICS)>DIAGNOSTIC TROUBLE CODE (DTC) .

    Is DTC of the power supply system displayed?

    Yes:  Perform the diagnosis according to the DTC.

    No:  Go to  2.

  2. CHECK FUSE  .
    1. Turn the ignition switch to OFF.
    2. Check the fuse.

    Is the check result OK?

    Yes:  Go to  3.

    No:  Replace the defective fuse.

  3. CHECK HARNESS BETWEEN BODY INTEGRATED UNIT AND BATTERY  .
    1. Disconnect the body integrated unit connector.
    2. Turn the ignition switch to ON.
    3. Measure the voltage between body integrated unit and chassis ground.

      Connector & terminal 

      (B280) No. 1 (+) - Chassis ground (-):

      (B287) No. 4 (+) - Chassis ground (-):

    Is the voltage 9 - 16 V?

    Yes:  Go to  4.

    No:  Repair the open circuit of harness between body integrated unit and battery.

  4. CHECK BODY INTEGRATED UNIT IGN POWER SUPPLY CIRCUIT  .
    1. Measure the voltage between F/B fuse No. 5 and chassis ground.

      Connector & terminal 

      F/B fuse No. 5 (+) - Chassis ground (-):

    Is the voltage 10 V or more?

    Yes:  Go to  5.

    No:  Repair the open circuit of the harness between body integrated unit and ignition switch.

  5. CHECK BODY INTEGRATED UNIT AND ACC VOLTAGE SUPPLY CIRCUIT  .
    1. Turn the ignition switch to ACC.
    2. Measure the voltage between F/B fuse No. 9 and chassis ground.

      Connector & terminal 

      F/B fuse No. 9 (+) - Chassis ground (-):

    Is the voltage 10 V or more?

    Yes:  Go to  6.

    No:  Repair the open circuit of the harness between body integrated unit and ignition switch.

  6. CHECK HARNESS BETWEEN BODY INTEGRATED UNIT AND CHASSIS GROUND  .
    1. Turn the ignition switch to OFF.
    2. Measure the harness resistance between the body integrated unit and chassis ground.

      Connector & terminal 

      (i84) No. 4 - Chassis ground:

      (B287) No. 1 - Chassis ground:

    Is the resistance less than 1 Ω?

    Yes:  Go to  7.

    No:  Repair the open circuit of harness between the body integrated unit and chassis ground.

  7. CHECK FOR POOR CONTACT  .

    Is there poor contact of connector?

    Yes:  Repair the poor contact.

    No:  End.