October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Check Relay
- Check the resistance between relay terminals.
| Terminal No. |
Inspection conditions |
Standard |
Circuit |
| 1 - 2 |
Always |
1 MΩ or more |
Courtesy of SUBARU OF AMERICA, INC.
|
| 1 - 2 |
Apply battery voltage between terminals 4 and 3. |
Less than 1Ω |
- Replace the relay if the inspection result is not within the standard value.