LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Subaru
>>
2020
>>
Forester Base
>>
Repair and Diagnosis
>>
Engine Mechanical
>>
Cooling System (Mechanical)
>>
Engine Cooling System
>>
Thermo Control Valve Assembly
>>
Inspection
>>
Check Thermo Control Valve Assembly
July 1:
So it begins
. Don't worry, this is not in the correct legal jurisdiction!
Check Thermo Control Valve Assembly
Measure the resistance between thermo control valve assembly terminals.
Courtesy of SUBARU OF AMERICA, INC.
Terminals No.
Standard
4 and 5
1.76±0.528 Ω (at 25°C (77°F))