LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2013 >> Forester X, Automatic Trans >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Fuel Injection System (H4DO) >> Tumble Generator Valve Assembly >> Inspection >> Check Motor
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Check Motor

  1. Connect the battery positive terminal to terminal No. 5 and the battery ground terminal to terminal No. 4, and check that the valve is fully opened on LH side and the valve is fully closed on RH side.
    CAUTION: Do not power the motor for more than 10 seconds.
    Fig 1: Checking Motor (Valve Fully Opened On LH Side)
    G08562676Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the battery positive terminal to terminal No. 4 and the battery ground terminal to terminal No. 5, and check that the valve is fully closed on LH side and the valve is fully opened on RH side.
    CAUTION: Do not power the motor for more than 10 seconds.
    Fig 2: Checking Motor (Valve Fully Opened On RH Side)
    G08562677Courtesy of SUBARU OF AMERICA, INC.