LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2010 >> Forester F4-2.5L DOHC Turbo >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Variable Valve Timing Solenoid >> Service and Repair >> Overhaul
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Overhaul

Oil Flow Control Solenoid Valve

DISASSEMBLY

1. Remove the two bolts which secure the oil return cover, and remove the oil return cover and gasket.
2. Remove the bolt which secures the oil flow control solenoid valve and remove the oil flow control solenoid valve.






ASSEMBLY

1. Install the oil flow control solenoid valve.

Tightening torque: 8 N.m (0.8 kgf.m, 5.9 ft.lb)

2. Apply liquid gasket to the two bolts which secure the oil return cover.

Liquid gasket: THREE BOND 1324 (Part No. 004403042) or equivalent

3. Install the oil return cover and gasket.

Tightening torque: 8 N.m (0.8 kgf.m, 5.9 ft.lb)

NOTE: Use a new gasket.