October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Power Window Switch: Testing and Inspection
Power Window Control Switch
INSPECTION
1.MAIN SWITCH
Measure switch resistance.
2.SUB SWITCH
Measure switch resistance. Replace the sub switch if faulty.