LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2006 >> Baja Base, Automatic >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission >> Oil Charger Pipe >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Oil Charger Pipe: Installation

  1. Install the oil charger pipe with new O-ring.

    Tightening torque: 41 N.m (4.2 kgf-m, 30.4 ft-lb) 

    Fig 1: Identifying Oil Level Gauge And Oil Charge Pipe
    G04990424Courtesy of SUBARU OF AMERICA, INC.
  2. Install starter motor.

    < Ref. to INSTALLATION , STARTER. >

  3. Install the air cleaner case or air intake chamber. (Non-TURBO model)

    < Ref. to INSTALLATION , AIR CLEANER CASE. >

  4. Install intercooler. (TURBO model)

    < Ref. to INSTALLATION , INTERCOOLER. >