October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Extension Case: Inspection
- Use forced air to make sure the transfer pipe and extension case routes are not clogged and do not leak.
- Measure the extension end play and adjust it to within specifications.
MPT model
< Ref. to
, MPT MODEL . >
VTD model
< Ref. to
, VTD MODEL . >