Sub-Switch Test
- Disconnect sub-switch connector. Measured voltage between harness connector terminal No. 1 and ground should be 10-13 volts. See Fig 1 .
- Check for harness short circuit between sub-switch and cruise control module. Resistance between terminal No. 2 and ground and terminal No. 3 and ground should be one megohm or greater. See Fig 2 .
- Check inner switch of sub-switch and check continuity at switch side connector. Resistance between terminals No. 1 and 2 (SET/COAST) and terminals No. 1 and 3 (RESUME/ACCEL) should be 10 ohms or less with switch on and one megohm or greater with switch off. See Fig 2 .